Keep an Eye Out | AAD Activation During Swoop

Published on Wednesday, November 30, 2022

Keep an Eye Out | AAD Activation During Swoop

Photo above by Moe Troyer.

While making a 450-degree turn for landing under a Performance Designs Velocity 79 main canopy, this jumper exceeded 78 mph below 750 feet AGL, which caused his Airtec Expert CYPRES 2 automatic activation device to deploy the reserve. Fortunately, the reserve deployed cleanly and remained stable, and the jumper had a rough landing but was unhurt. This jumper had flown the same wing for 13 years and had routinely performed the same turn for landing for more than 10 years without incident. However, on this jump, it appears he met the AAD’s activation threshold, and it functioned as designed.

Jumpers who perform induced-speed landings should review their AADs’ activation parameters to ensure that they stay well below threshold. Inadvertent reserve deployments at low altitudes have caused severe injuries and even death. Those who are nearing their AAD’s activation speeds during landing should switch to an AAD made particularly for that application. For example, the activation threshold on an Airtec CYPRES Speed model is 102 mph below 750 feet, which would have been high enough to prevent this incident from occurring.

Comments (0)Number of views (24848)
Print
 
Broad Stripes and Bright Stars
Feb 23, 2026

Broad Stripes and Bright Stars

USPA Winter Board Meeting Concludes
Feb 17, 2026

USPA Winter Board Meeting Concludes

Guardians of the Drop
Feb 16, 2026

Guardians of the Drop

 

 
Photo by Alex Swindle

Wingsuiter Ben Poling takes a dock with a smiling Colby Groves at the Who In The Ville Stole the Christmas Boogie at Skydive Arizona in Eloy.

AXIS

 

USPA SIS

Mystery Solved
Five Minute Call | Jul 01, 2019

Mystery Solved

Rich Grimm | D-18890
Profiles | Jul 01, 2019

Rich Grimm | D-18890

Tales From the Bonfire
Tales from the Bonfire | Jul 01, 2019

Tales From the Bonfire

USPA SIS

Monday, July 1, 2019

Letters | Jul 01, 2019

Letters

Monday, July 1, 2019

Letters | Jul 01, 2019

Letters

Monday, July 1, 2019

Letters | Jul 01, 2019

Letters

Monday, July 1, 2019

Letters | Jul 01, 2019

Letters

USPA SIS

“Watching My Opening”
Featured Art | Jul 01, 2019

“Watching My Opening”

Don't Delay, Cut Away!
Gearing Up | Jul 01, 2019

Don't Delay, Cut Away!

Donors
Five Minute Call | Jul 01, 2019

Donors

USPA SIS

First101102103104106108109110Last