UPT Identifies Problem with Vector Student Containers, Offers Fix

Published on Friday, February 12, 2021

UPT Identifies Problem with Vector Student Containers, Offers Fix

On February 11, United Parachute Technologies announced that it had identified problems affecting the reserve deployment on some of its Vector SE student containers and has offered a field fix, as well as a permanent fix. Read the full statement here:

“It has recently come to our attention that a range of Vector SE student containers built between May 2013 and January 2021 are facing potential problems with reserve deployment. At this time, UPT engineers have reviewed and tested the reserve deployment and have found that the following sizes are affected: SE 360-1 SE 360-2, SE 360-3, SE 361, SE 364 and SE 364-1. We have determined the problem and are carrying out the solution as quickly as possible.

Customers who purchased the affected sizes of Vector SE containers during that time period have been contacted directly. We are in the process of building new reserve flaps which we will be shipping out to these customers for installation over the next 2 weeks. The containers can also be returned to UPT for installation of the new reserve pin cover flap.

In the short term we can offer a temporary field fix for the affected range of containers, please see the attached work instructions for this fix. If you wish to use these SE’s in the interim before the new reserve pin covers can be installed, it is mandatory that you perform this temporary field fix. The fix must also be performed by a master rigger.

In addition to addressing the reserve pin cover, we also ask that our customers ensure that reserve closing loop lengths are within the recommended range outlined in the Vector Manual. Please refer to the Vector 3 manual under the Reserve Packing Manual section, page 33 (the SE manual is an addendum to this) where it states ‘NOTE: The pre‐stretched reserve closing loop will measure 4 ½ inch +/‐ ½ inch.’ A correct reserve closing loop length is needed to ensure the proper operation of this system.

We apologize for this situation and are doing everything possible for a fast but correct resolution.”

Instructions for field fix here: https://uptvector.com/wp-content/uploads/2021/02/INSTRUCT.-V3SE-Reserve-Pin-Cover-Field-Modification-REV-1.pdf

Comments (0)Number of views (16822)
Print

Leave a comment

This form collects your name, email, IP address and content so that we can keep track of the comments placed on the website. For more info check our Privacy Policy and Terms Of Use where you will get more info on where, how and why we store your data.
Add comment
 
USPA Seeks Web Designer-Copywriter
Jan 10, 2025

USPA Seeks Web Designer-Copywriter

Photo by Ray Cottingham | D-1653
Dec 17, 2024

Photo by Ray Cottingham | D-1653

 

 
Photo by Javier Ortiz

Three trails flock across the sky during the Momentum Flock and Flow camp at Skydive Paraclete XP in Raeford, North Carolina.

Skydive Store

 

Peregrine

Deadly Serious
Features | Jun 01, 2017

Deadly Serious

Thursday, June 1, 2017

The Rating Corner | Jun 01, 2017

Providing Your Students the Best

A Long Night in a Swamp
Tales from the Bonfire | Jun 01, 2017

A Long Night in a Swamp

Peregrine

John Bull | D-6450
Profiles | Jun 01, 2017

John Bull | D-6450

Minimum Age to Skydive
Gearing Up | Jun 01, 2017

Minimum Age to Skydive

15 Minutes of Fame
Tales from the Bonfire | May 01, 2017

15 Minutes of Fame

Peregrine

Up is the New Down
Features | May 01, 2017

Up is the New Down

Lisa Mazzetta | D-30274
Profiles | May 01, 2017

Lisa Mazzetta | D-30274

ATC Corporate Privatization
Gearing Up | May 01, 2017

ATC Corporate Privatization

A Jump Story
Gearing Up | Apr 01, 2017

A Jump Story

Peregrine

First145146147148150152153154Last