Keep an Eye Out | Damaged Reserve Closing Loop

Published on Wednesday, September 29, 2021

Keep an Eye Out | Damaged Reserve Closing Loop

During a recent USPA Coach Course, the candidates practiced gear checks with their own equipment. When they inspected the area under their reserve flaps, the examiner noticed damage on one of the candidates’ reserve loops. The candidate believed that it may have happened during a bad landing weeks earlier.

Although a main closing loop can have as much as 10% wear before being replaced, this standard does not apply to the reserve loop. The reserve closing loop should be in near-perfect condition. A rigger can easily replace a reserve closing loop on their own pack job, and most riggers will do it for a fraction of the cost of a repack. Some riggers will even do it for free to encourage proper gear maintenance. If the original rigger is not available, a new rigger would have to perform an entire reserve repack, since replacement requires breaking the seal that designates whose pack job it is. In either case, it is a good investment. A reserve closing loop breaking at an inopportune moment could easily be deadly.

Comments (0)Number of views (14417)
Print
 

 

 
Photo by David Cherry

At the USPA National Championships of 4-Way Formation Skydiving at Skydive Arizona in Eloy, Ranch TNT competes in the open class and earns selection to the U.S. Parachute Team for the female 4-way division at the world championships.

Skydive Store

 

USPA SIS

Collapsing a Slider
Foundations of Flight | Mar 02, 2018

Collapsing a Slider

PC in Tow
Keep An Eye Out | Mar 02, 2018

PC in Tow

Friday, March 2, 2018

Safety Check | Mar 02, 2018

Stay Calm and Open Straight

USPA SIS

Friday, March 2, 2018

The Rating Corner | Mar 02, 2018

Marijuana Use

Friday, March 2, 2018

Tales from the Bonfire | Mar 02, 2018

The Turkey Story

Holiday Escapes
Features | Mar 02, 2018

Holiday Escapes

USPA SIS

Tom Jenkins | D-7707
Profiles | Mar 02, 2018

Tom Jenkins | D-7707

Monthly Cutaway System Maintenance
Features | Mar 02, 2018

Monthly Cutaway System Maintenance

Extracurricular Activities
Features | Mar 02, 2018

Extracurricular Activities

USPA SIS

First147148149150152154155156Last