UPT Identifies Problem with Vector Student Containers, Offers Fix

Published on Friday, February 12, 2021

UPT Identifies Problem with Vector Student Containers, Offers Fix

On February 11, United Parachute Technologies announced that it had identified problems affecting the reserve deployment on some of its Vector SE student containers and has offered a field fix, as well as a permanent fix. Read the full statement here:

“It has recently come to our attention that a range of Vector SE student containers built between May 2013 and January 2021 are facing potential problems with reserve deployment. At this time, UPT engineers have reviewed and tested the reserve deployment and have found that the following sizes are affected: SE 360-1 SE 360-2, SE 360-3, SE 361, SE 364 and SE 364-1. We have determined the problem and are carrying out the solution as quickly as possible.

Customers who purchased the affected sizes of Vector SE containers during that time period have been contacted directly. We are in the process of building new reserve flaps which we will be shipping out to these customers for installation over the next 2 weeks. The containers can also be returned to UPT for installation of the new reserve pin cover flap.

In the short term we can offer a temporary field fix for the affected range of containers, please see the attached work instructions for this fix. If you wish to use these SE’s in the interim before the new reserve pin covers can be installed, it is mandatory that you perform this temporary field fix. The fix must also be performed by a master rigger.

In addition to addressing the reserve pin cover, we also ask that our customers ensure that reserve closing loop lengths are within the recommended range outlined in the Vector Manual. Please refer to the Vector 3 manual under the Reserve Packing Manual section, page 33 (the SE manual is an addendum to this) where it states ‘NOTE: The pre‐stretched reserve closing loop will measure 4 ½ inch +/‐ ½ inch.’ A correct reserve closing loop length is needed to ensure the proper operation of this system.

We apologize for this situation and are doing everything possible for a fast but correct resolution.”

Instructions for field fix here: https://uptvector.com/wp-content/uploads/2021/02/INSTRUCT.-V3SE-Reserve-Pin-Cover-Field-Modification-REV-1.pdf

Comments (0)Number of views (16808)
Print

Leave a comment

This form collects your name, email, IP address and content so that we can keep track of the comments placed on the website. For more info check our Privacy Policy and Terms Of Use where you will get more info on where, how and why we store your data.
Add comment
 

 

 
Photo by Javier Ortiz

Three trails flock across the sky during the Momentum Flock and Flow camp at Skydive Paraclete XP in Raeford, North Carolina.

Innhopps

 

Innhopps

50 Years of Freefall
Features | Apr 02, 1969

50 Years of Freefall

Development of the Rogallo Flexible Wing
Features | Dec 01, 1968

Development of the Rogallo Flexible Wing

Bob Buquor Memorial Star Crest
Features | Dec 01, 1968

Bob Buquor Memorial Star Crest

Innhopps

August 1968
Covers | Aug 02, 1968

August 1968

June 1968
Covers | Jun 01, 1968

June 1968

May 1968
Covers | May 01, 1968

May 1968

First146147148149150151152153155